Login:   Password:
Not Register?    Sign Up NOW!
Date: 07 November 2009
Google
 
Large Hadron Collider (LHC) Press Release
Reset filter Category:  Type: 
Records 61-80 of 99  |  Go to << Prior 1 2 3 4 5 Next >> page 

"Right now things are really picking up," says David Fritz

732 days 4 hours 19 minutes ago :: 06 November, 2007

As construction continues on the experimental halls that will receive the beam from the Linac Coherent Light Source (LCLS), the instruments that... more

Scientists taking next DUSEL step into a National Underground Laboratory

Scientists taking next DUSEL step into a National Underground Laboratory

733 days 3 hours 44 minutes ago :: 05 November, 2007

About 200 scientists are in Washington this weekend to discuss the next steps toward converting the Homestake gold mine into a national underground... more

Progress report on String theory that returned the favor by sounding at times very much like Greek

Progress report on String theory that returned the favor by sounding at times very much like Greek

740 days 4 hours 30 minutes ago :: 29 October, 2007

The Nobel Laureate in Physics introduced his mind-boggling subject in a way that cats and dogs could understand, with a cartoon from the New... more

American high energy physics program is in a state of transition

American high energy physics program is in a state of transition

743 days 5 hours 34 minutes ago :: 26 October, 2007

Much like SLAC, the American high energy physics program is in a state of transition. With the shutdown of the SLAC's B-factory late next year and... more

Standard Model's next theory, typically predict new phenomena to show up at high energies

Standard Model's next theory, typically predict new phenomena to show up at high energies

744 days 4 hours 51 minutes ago :: 25 October, 2007

A famous character once said, "Life is like a box of chocolates… You never know what you're gonna get." In particle physics, we do not follow this... more

Extremely Large Databases Workshop at SLAC

Extremely Large Databases Workshop at SLAC

744 days 5 hours 2 minutes ago :: 25 October, 2007

Data collections at SLAC aren't just pretty big—the experts call them "Extremely Large Databases." BaBar's two petabytes of data will seem paltry... more

Physicists sent a Neutrino particle under the Earth's crust

Physicists sent a Neutrino particle under the Earth's crust

744 days 16 hours 52 minutes ago :: 25 October, 2007

Physicists have taken a snapshot of an elusive neutrino, in research that could one day explain why some of the universe's mass seems to be... more

A new Approach against String theory

A new Approach against String theory

744 days 16 hours 53 minutes ago :: 25 October, 2007

Ernest Rutherford used to tell his physics students that if they couldn't explain a concept to a barmaid, they didn't really understand the... more

Cartoon: SLAC engineer takes it to the next level

Cartoon: SLAC engineer takes it to the next level

744 days 16 hours 55 minutes ago :: 25 October, 2007

Lots of people doodle—a stick figure in the margins of a notepad or maybe a geometric design in the corner of a lab notebook—but SLAC engineer... more

A six-ton block of granite in Linac Coherent Light Source (LCLS) Project

A six-ton block of granite in Linac Coherent Light Source (LCLS) Project

745 days 18 hours 55 minutes ago :: 24 October, 2007

The Linac Coherent Light Source (LCLS) project is a collaboration that brings together components and equipment from dozens of suppliers. Last... more

CERN and IHEP collaborate well on Beam-loss Monitors System

CERN and IHEP collaborate well on Beam-loss Monitors System

746 days 18 hours 24 minutes ago :: 23 October, 2007

The circulating beams will store an unprecedented amount of energy when the LHC is in operation. If even a small fraction of this beam deviates... more

Major upgrade of the Beijing Electron–Positron Collider  came to a successful conclusion

Major upgrade of the Beijing Electron–Positron Collider came to a successful conclusion

746 days 18 hours 24 minutes ago :: 23 October, 2007

The first phase of commissioning BEPCII, the major upgrade of the Beijing Electron–Positron Collider (BEPC) came to a successful conclusion on 3... more

Large Area Telescope (LAT) Project's members awarded on behalf of the NASA Goddard Flight Center

Large Area Telescope (LAT) Project's members awarded on behalf of the NASA Goddard Flight Center

747 days 4 hours 51 minutes ago :: 22 October, 2007

the Large Area Telescope (LAT) Project awarded certificates of appreciation to the 58 members of the LAT Environmental Test team, on behalf of the... more

PEP-II accelerator has now delivered double the amount of data originally expected

PEP-II accelerator has now delivered double the amount of data originally expected

764 days 6 hours 11 minutes ago :: 05 October, 2007

A steady push during the course of eight years, the PEP-II accelerator has now delivered double the amount of data originally expected when the more

New Computer Security In Fermilab

New Computer Security In Fermilab

775 days 3 hours 59 minutes ago :: 24 September, 2007

Imagine: A pleasant, but flustered gentleman says he's late for a lecture and needs to print a copy of his presentation. He asks you to print it... more

International flair in 2007-2008 Fermilab Arts Series

International flair in 2007-2008 Fermilab Arts Series

785 days 22 minutes ago :: 14 September, 2007

Janet MacKay-Galbraith hopes that one word can capture the spirit of this year's Fermilab Arts Series: Wow. This season's line-up features... more

UAB is participating in the LHC

UAB is participating in the LHC

786 days 3 hours 48 minutes ago :: 13 September, 2007

Scientific Information Port (PIC), a technological centre located on the campus of the UAB, started work on the first stage of the European project... more

New look of LCLS

New look of LCLS

794 days 5 hours 19 minutes ago :: 05 September, 2007

A notable up-tick in tunneling activity occurred at the end of August as construction teams opened a third tunnel port behind the Collider Hall... more

New design for superconducting cavities for linear colliders

New design for superconducting cavities for linear colliders

799 days 1 hour 21 minutes ago :: 31 August, 2007

At Texas A&M University, a team led by Peter McIntyre has developed a new design for superconducting cavities for linear colliders, perhaps even... more

The first warm

The first warm "L-Band" accelerator structure for ILC project

816 days 10 minutes ago :: 14 August, 2007

The Klystron Microwave Department has finished fabricating the first warm "L-Band" accelerator structure to fill a unique niche in the... more

Records 61-80 of 99  |  Go to << Prior 1 2 3 4 5 Next >> page 
Home | Members.Benefit | Privacy.Policy | Bookmark.This.Page | Contact.Us
© 2006 - 2007 4engr. All Rights reserved

|Conveyor technology