Everything Engineering
Login:   Password:
Not Register?    Sign Up NOW!
Date: 22 November 2008
Google
 
Gemini 3  
Search Country   Reset filter

Company Name: Gemini 3

Company Type: Nasa Project

Company Profile

Gemini 3 was launched from Complex 19 at 9:24 a.m. EST (14:24:00.064 UT) and inserted 5 minutes 54 seconds later (9:29:54 a.m. EST) into a 161.2 x 224.2 km (87 x 121 nautical mile) orbit with a period of 88.3 minutes. At the end of the first orbit Grissom effected the first orbital maneuver, which lowered the orbit to a near-circular 158 x 169 kms. On the second orbit Grissom altered the spacecraft inclination by 0.02 degrees. Near the end of the third orbit, at 4:21:23 ground elapsed time, or GET (1:45:23 p.m. EST) the perigee was lowered to 84 km to allow the orbit to decay naturally in case of retrorocket failure. Reentry began at the end of the third orbit and was manually controlled with retrofire at 4:33:23 GET (1:57:23 p.m. EST). At an altitude of 90 km about 7 kg of water were injected into the ionized plasma sheath resulting in improved communications during the blackout period. Splashdown occurred in the Atlantic in the vicinity of Grand Turk Island, at 22.43 N, 70.85 W, at 4:52:31 GET (2:16:31 p.m. EST). Due to less-than-expected spacecraft lift during reentry, the spacecraft landed 111 km short of the target point. Both astronauts became seasick, removed their suits, and left the spacecraft at about 3:00 p.m. EST. They were picked up by helicopter and taken to the recovery ship U.S.S. Intrepid at 3:28 p.m. EST, where they were found to be in good condition. The Gemini capsule was recovered at 5:03 p.m. EST. Two of the three experiments were performed successfully, the third, sea urchin egg growth in zero-G, was not due to a mechanical failure. The photography objective was only partially achieved because of an improper lens on the 16 mm camera. All other mission objectives were achieved.

About Company

Gemini 3 was the first crewed Earth-orbiting spacecraft of the Gemini series. It was piloted by astronauts Virgil "Gus" Grissom and John Young, with the primary objective of demonstrating the crewed qualifications of the Gemini spacecraft including evaluation of the two-man Gemini design, the worldwide tracking network, the orbit attitude and maneuver system (OAMS), the control of reentry flight path and landing point, spacecraft systems, and spacecraft recovery. Secondary objectives included evaluation of flight crew equipment and effects of low level launch vehicle oscillations (POGO) on the crew, performance of three experimants, and to obtain photographic coverage from orbit.

Address: GSFC-Code 690.1,NASA Goddard Space Flight Center, Greenbelt, MD 20771  City: Greenbelt      State:: Greenbelt
Contact: Dr. David R. Williams  Phone: 301-286-1258      Fax::  
Website: http://nssdc.gsfc.nasa.gov  Email:
Registered: 15 September, 2006 01:12
Related Company: Astronaut Scholarship Foundation, batesmotel.8m.com, clavius.org, Gemini 6A, Gemini 7, Gemini 9A, jsc.nasa.gov, Mercury Redstone, Mourns For Apollo, NASA History Division, National Aeronautice and Space Administration, NON-FAKED MOON LANDINGS, nssdc.gsfc.nasa.gov, Project Apollo: A Retrospective Analysis, Servicing Mission 3A, Since Landing, Skylab, Solar System Ambassador Bess Amaral, space.gc.ca, Texas Space Grant Consortium, THE STS 106 WEBSITE, The Wrong Stuff
Home | Members.Benefit | Privacy.Policy | Bookmark.This.Page | Contact.Us
© 2006 - 2007 4engr. All Rights reserved |Recommended Engineering Sites:| Center for Respect of Life and Environment | Internet Dictionary|Enginering intent(Engineering Events) | Map Archive